Product Range

The AXIS Product Line

The AXIS roadmap sets out three planned configurations for different shed types and volumes. Final performance, construction and potential output pathways remain subject to validation and specification confirmation.

Choose Your Model

Choose the AXIS model that fits your farm

Review the planned configuration most relevant to your shed type and daily waste milk volume. All specifications are indicative and subject to final validation, testing and configuration confirmation.

Herringbone Sheds

AXIS WAI-3

Planned Entry Configuration

Indicative Milk InputUp to 1,026 L/day
Indicative Powder OutputUp to 82 kg/day
Indicative Seasonal Output (270 days)Up to 22.1 t/season
Power DrawAvailable on request
FootprintAvailable on request
Planned for: Herringbone sheds processing 90 to 120 L/day inline residue plus event waste.
Enquire Now
Rotary Sheds & Hubs

AXIS AWA-5

Planned Standard Configuration

Indicative Milk InputUp to 1,710 L/day
Indicative Powder OutputUp to 137 kg/day
Indicative Seasonal Output (270 days)Up to 37.0 t/season
Power DrawAvailable on request
FootprintAvailable on request
Planned for: Rotary sheds or communal hubs of 3 to 5 herringbone farms processing 300 to 400 L/day.
Pre-Order Now
Regional Hubs & Processors

AXIS UA-8

Planned Hub Configuration

Indicative Milk InputUp to 2,736 L/day
Indicative Powder OutputUp to 219 kg/day
Indicative Seasonal Output (270 days)Up to 59.1 t/season
Power DrawAvailable on request
FootprintAvailable on request
Planned for: Regional hubs aggregating 3 to 5 rotary farms or commercial processors handling 450 to 1,000+ L/day.
Enquire Now

* Indicative capacity and output figures are based on 8% total solids and 18 hours operating time per day. Actual results will vary by milk composition and operating conditions, and remain subject to final validation and specification confirmation.

All pricing is available on request. Contact us for a tailored quote based on your shed type and daily waste milk volume. Use the AXIS App to calculate your estimated payback period before you get in touch.

The Process

From Waste Milk to Powder in Four Steps

01

Collect

Waste milk is intercepted before the CIP flush and gravity-drained into a dedicated collection tank, separate from your bulk tank.

→
02

Pre-Treat

For streams with a treatment history, the development programme is assessing an appropriate pre-treatment pathway. Stream suitability and any future end use remain subject to validation and applicable requirements.

→
03

Dry

Eligible streams are being assessed through the AXIS drying process. Processing performance, product characteristics and final specifications remain under validation.

→
04

Collect Powder

The development programme is assessing collection and storage requirements for any stable powder output. Any future end-use pathway remains subject to evidence and applicable requirements.

Ready to Recover Your Waste Milk?

Reserve a first-run position for the planned AXIS WAI-3 with a NZD $500 deposit. Final system specifications, timing and price will be confirmed before any final sales agreement.